18!
OCO
and Estimate and, could not have been estimated for till the arrival of the Master, these are given in detail. as for
necessary to pay for them by measured completed .
possible, it will be nes
work as
they
CAL
$4000. on
Fire
was
The Contractor for the Mint Buildings incurred a loss of some
the 10th Aprils last from which broke out in his temporary workshops. Hope held out to him at the time that if the Buildings were satisfactorily completed within the time specified he would receive some allomance from the Government. It is proposed that
a sum of $ 2000 be allowed him :
30 p Cazuzahar
40ft-lin Backsteps
Forward
196
702 76 2454 19
3.5
14
6484
13186
$1.50.
72. ft in Granite pail to Ballustrado... c 50°.. 66 ft line
Do Plinth dr
36
502
ބ
اره کردم
311⁄2 ft lin Granite Winders Fills
4. Stone Corbels 2′′x 12′′ x 12′′
30 Cuboft Granite Pressemers rough dressed 40.0°.. 11725 Cubeft of Brickwork set in Morta
including stucco
65 ft bin. Batlustrade pail
1500 duplift Ned File paving.
12
130
C/
40%.
8.
175875
261
/20
296
20.
1250
168
18% Squares Poof tiled with Battons * Perline of $16 622 ft Ein Earthen raw e
et pouts.
144 Squares China fir flooring + Joists ... $121. 48 Cubeft Hard toood Girders.
a b l
1500 Suplift framing to Fliers Verandah & 10%.
Inner Staircase all hardwood.
9 Junch Casements Hardwood frames &
Vinitions without dussings
انی ہے پیر
156
747
180
36
2.50
10
"Jashes Hardwood frames & Vinitions. #12 41 Hardwood Couvre Venlitators..
Forward-3697|87 2454|19
No comments yet.
Private notes are available after approval.